Fleet Operators

Electrify Your Fleet -Without Operational
Disruption.

Infrastructure planning, funding navigation, and full electrification delivery - without operational disruption or in-house expertise required.

Rushmoor branded electric vehicles charging at a commercial depot

The Challenge

Fleet Electrification Shouldn’t RequireBecoming an Energy Expert

Grant Maze

Charging grants, LEVI funding, Workplace Charging Scheme - navigating what applies to your fleet takes expertise most operators don’t have in-house.

Vendor Fragmentation

Charger suppliers, installers, DNO, landlord, and grid connection managed separately causes delays, cost overruns, and conflicting responsibilities.

Infrastructure Uncertainty

Grid capacity, load balancing, and depot power requirements are technical decisions that directly impact your operational continuity if misjudged.

Fleet electrification is operational change — not just hardware installation.

Our Process

How Fleet Transition Is Delivered

STEP 1

Assessment

Depot audit: power capacity, vehicle dwell times, and charging demand profiling.

STEP 2

Design

Infrastructure blueprint: charger placement, load management, and grid connection strategy.

STEP 3

Funding

Grant applications, OZEV submissions, and finance structuring managed end to end.

STEP 4

Deployment

Installation coordinated around your operational schedule with zero unplanned downtime.

STEP 5

Monitoring

Live performance dashboards with proactive fault detection and ongoing support.

Our Approach

Phased installation to protect operations continuity throughout

Funding-first design that maximises grant recovery before commitment

Single point of contact from assessment through to handover

Landlord, DNO, and planning liaison handled entirely on your behalf

Funding

Maximize Available Funding

Commercial EV Charge Point Grant

£350per charger

OZEV grant available for eligible commercial premises. We manage the full application process - you simply receive the reduction in your project cost.

Get Funding Assessment

Additional Funding Opportunities

Workplace Charging Scheme (WCS)

Up to £350 per socket for eligible businesses installing workplace charge points.

Local EV Infrastructure (LEVI) Fund

Capital funding for local authorities and private operators expanding public and semi-public charge point networks.

Enhanced Capital Allowance (ECA)

100% first-year tax allowances on qualifying EV charging infrastructure investments.

We identify all applicable funding, prepare applications, manage compliance, and secure grants before installation - reducing your capital requirement significantly.

What You Get

Complete Infrastructure Withoutthe Expertise Burden

Depot-First Planning

Charging infrastructure designed around your depot layout, vehicle types, shift patterns, and future fleet growth - not a generic template.

Funding Navigation

Every available grant and incentive identified, applied for, and managed - before a single charger is ordered, minimising your capital outlay.

Phased Rollout

Staged deployment that keeps your fleet moving throughout. No operational shutdowns, no surprise delays, no impact on throughput.

Performance Visibility

Real-time monitoring dashboard. Utilisation, cost per charge, and fleet readiness visible at a glance - with proactive fault detection.

Transition Managed — With Operational Safeguards

Single supplier accountability from design through to go-live

Proactive load management preventing depot power overload

Charging management software configured to your fleet specification

24/7 remote monitoring with guaranteed response SLAs

Landlord, DNO, and planning liaison handled on your behalf

Why It Matters

What Fails Without Planning

Typical rollout problems

Failed grant applications due to late or incomplete submission

Charger locations incompatible with actual depot workflow

Grid overload causing unexpected operational shutdowns

Poor vehicle and charger spec leading to range anxiety

Vendor conflicts, delays, and missed handover deadlines

Planned rollout outcomes

Full grant recovery secured before installation begins

Infrastructure designed around actual operational patterns

Load management preventing grid constraints from day one

Correct charger specification matched to every vehicle type

Scalable infrastructure built to grow with your fleet

Qualify

Is This Relevant For You?

You operate 5 or more commercial vehicles from a single depot

You're planning to transition to electric in the next 12-36 months

You want to reduce fuel and operational costs without internal complexity

You need to meet upcoming ZEV mandate requirements

You're unsure which grants or funding schemes you qualify for

You want infrastructure that scales with your fleet over time

Get Started

Start Your Fleet Electrification Journey

Book a no-cost fleet assessment. We’ll review your fleet size, depot setup, operational requirements, and funding eligibility - in a single conversation.

Your data is secured and processed by Rushmoor Renewables.